Ground Combat Training Systems
Field Maintenance Reports:
KSI Rework
AT4 Simulator Rework
Helmet Packing
M249 In-Repair Instructions
TDTC/PC Cable Rework
DPCU Flex Cable Fix
CT-TDTD Time Synch
Frequently Asked Questions
AT4 SIMULATOR ASSEMBLY
DRAWING 147751 SITE REWORK
Click on the thumbnail to enlarge
2. Using syringe, apply RTV
in the Sight Channel along
the right front side of Sight.
Make certain that Sight
channel is filled with RTV.
3. Using syringe, apply RTV
in the Sight channel along
the left front side of Sight.
Make certain that Sight
channel is filled with RTV.
4. Using syringe, apply RTV
in the Sight channel along
the bottom front of Sight.
Make certain that Sight
channel is filled with RTV.
5. Allow RTV applied to
front of Sight to dry for
approximately five (5)
minutes before proceeding.
6. Using syringe, apply RTV
in the Sight channel along
the right rear side of Sight.
Make certain that Sight
channel is filled with RTV.
7. Using syringe, apply RTV
in the Sight Channel along
the left side of Sight. Make
certain that Sight channel
is filled with RTV.
8. Using syringe, apply RTV
in the Sight channel along
the bottom rear side of Sight.
Make certain that Sight
channel is filled with RTV.
9. Allow RTV applied to
front of Sight to dry for
approximately five (5)
minutes before proceeding.
10. Remove excess RTV
from top edge of front and
rear sight. Air cure for 72
hours.
Corporate Home
|
CDA Home
|
Products & Services
|
Newsroom
|
Contact Us
|
Search
|
Top
Copyright © 2004 ALL RIGHTS RESERVED Cubic Corporation